Part 5 https://theenergyst.com/biggest-homes-upgrade-plan-in-british-history/ Ouch!!! Another simplistic objective!! Time for more joined up thinking!! In terms of copper and money a massive ugrade to the underground 415V sytem and, more importantly, the 11kV/415V transformers which together form the largest part of the 800000km and 58500 substations on the Distribution system, to support HPs and EVs would be crippling and thus counter productive as regards use of funds. And as regards Distribution losses overall. Alternative as in the previous notes is the proposal for Large Premises, Campus and District heat centres at 33 and 11kV levels with big HPs and CHPs, the latter with Sync comp and enhanced Inertia capability, to handle Dunkelflaute through HellWindig. Also, by intelligent part autonomous control with Automatic DSO override, to regulate flows and provide stability at Distribution and Transmission levels from 11/33kV upwards. Heating by Simpler pipe technology to premises, inc repurposing the last mile gas pipes. Also with Heat Temperature conversion [MAN ETES) at the centres to boost temperatures from the Big HPs and get round the Radiator temperature issues. Also with colocated EV Charge points as we there have already been the need for upgrades to older house single phase 16mm^2 60Amp 14kVA connections to the road cable. To 25mm^2 100Amp 24kVA. For rural communities with properties spread out and overhead 415 supplies then OK go for circuit and (a lot of pole) transformer upgrades. Especially in locations with no mains Gas to replace inefficient use of 'delivered' fossil Fuels.