Part 4 I probably didn’t stress hard enough the need for serious Automation, especially at the Customer end. As stressed in FPS 20 and 21 at www.eleceffic.com ; the Smart Enterprise and the Smart Customer. Written initially 15 years ago; prompted by Pacific Gas and Electric’s issues with their Smart Rollout due to insufficient initial Customer Engagement. As regards comms I didn’t define 2 acronyms as taken from the Settlement Metered Half Hour Project. MSA – Meter System Advanced – the 850000 Dial Up meters. Started from 1990 for all premises over 1Mw then in 1994 all premises over 100kW. The latter includes the Electricigty National Control Centre buildings individually. Then in 2012 MSA was expanded to cover even more non Domestic sites. Noting the phone lines will/will have gone to Fibre to the premises (OFCOM 21CV project) with the need for local powered termination. Hopefully a lot of the non domestic sites will have Backup generation with Islanding Switchover. I have had a 21CV landline via my Virgin Media Hub (Fibre to the road box, Coax to the premises) for over a year. And, with the PV/Battery/Inverter installation, I also have an Islanding switch. MSS – Meter System Smart (SMETS). Increasing deployment to the rest of the 39 million Meter points. With the Elective services route for ‘other data’. The Data Communications Company has been asking for stakeholders wishing to use the route. Also of course rather a lot of unmetered ‘road furniture’ connections. Lamp Posts, Road signs, Traffic Lights…. Etc. Being Autistic I carry the associated System Thinking Trait with the associated curse of Overthinking…. Hence my experience with getting the Scheduling model (Heuristic to 1998), with its complex set of inputs, to work.# One odd point is the use of Electrolytic Oxygen in IC Engine Air intakes to boost efficiency. Noting of course that I/C and CT Gas engine manufacturers now have H2 ready versions. And local storage of O2 for medical purposes? Off direct topic but relevant to Thermal Efficiency. As regards the Building industry, why are we still looking at Bricks for the outer part of a Cavity wall; our brickworks closed in the 2008-10 recession.. Inner Wall 4 inch Structural Blocks and Outer Wall 5 inch Thermal blocks Is better, plus of course Cavity insulation. As I had done with an extension in 1988; pebbledash outer surface skin. Any outside cladding can be used, including ‘Brick slips’ for those who want that appearance. Noting the King had Pillar cladding added to Highgrove which improved the appearance of the Front considerably. Regards Steve