Part 3 And the whole lot needs to be monitored a managed to be operable.  Which is the case for active DER anyway.  Which needs the DSOs up to speed with the high volume data interface to the ESO.   More on operability. As regards getting Behind the Mater we have 850000 non domestic prmises with Dial Up meters; dedicated phone line to each.  Those could be configured to an ESiI data network and Premises Facilities Management enhanced for interaction with DSO (and Market).  With DSO applying security and stability reqruirements for his own Network (noting Active Network Management) and as applied for transmission with the ESO.     And the umpteen million Smart (SMETS) meters has an Elective Services route for Stakeholder defined data.  Again to get behind the meter.     But why didnt we go for Powerline carrier!   With OFCOM sending the Landlines to Fibre and the Cellular system, not reliable under failure (cf Iberia Collapse) the systems aren't robust.  The American Distributors even went to Broadband over Powerline when asked by the FCC who were looking at Remote Areas Digitalisation.  Just needs RF bridges round the Transformers.   Then backhaul into the DNO at say 33kV Subs which have backup batteries for switch operation if incomers fail. So, where to put the Electrolysers?  Moving H2 by pipe aint as easy as CH4. There are proposals re storage by NH3.   As a coincidence, another expert also has a solution using Combustion Turbines with Clutch and enhanced Phase Jump/Inertial correction    (no collusion I promise you). Using an Auxiliary Power Motor instead of a Flywheel to enhance the Inertia Constant.  But assuming Low Load Factor for Flexible Plant. Which gets round my Flywheel weight problem.  Now, with the variability and predictability issues with renewables in each proposed mix, modelling to evaluate the Load Factors and therefore worth (Fixed and Load Related Costs will require a new technique.  The classic method of using definitive Time series runs will not give a correct answer.  I know this from having driven a low Merit Fast reaction Station and having seen the effect while on shift as a costing engineer at National.  Then got the big System-Fuel Allocation Iterative model to run efficiently, with 12 Monthly Time Series schedules driving the Annual Fuel Allocation to produce Merit Order Fuel Heat Costs.  With Fuel supplies branch complaining it underallocated units to Marginal Plant.   The reason being Reserve Utilisation and Short Term Commitment requirements.  And finally getting the Time series scheduler into Control (1985) with its major improvement (National Optimisation at all schedule points)  over the Manual Inter-Area Transfer system (optimisation only at Peaks and Troughs).  I'd worked the latter process as Costing Engineer at NC.  And the Scheduler would make a major, and perfectly correct, change to the workloads of the 7 Areas and 14 District Loading Engineers  Concentrated periods of activity and big lulls.,    When I got the job of getting the Scheduler to 'Work' in late 1981 I concluded the only way to study this was by running 'Walkthrough' of the Commitment through Dispatch processes, with the data changes being thrown sequentially in pseudo real time, at the Engineers doing the job in simulation.  Not a hope then put now we have the Dispatcher Training Simulator.  Thus 25 year definitive Time Series runs, using the PLEXOS MILP scheduler aint going to cut it. We need say 2 to 3 week walkthrough, with complete sets of predictive to real time changes (inc trips) to exercise each proposed plant mix. Different Periods of the Year and Renewables moving between extremes (DunkelFlaute to Hell Windig and back).            So, I put Walkthrough (with AI analysis of Operator action to Automate same in simulation, Customer through DSO to TSo interface with the MSA and MSS routes , Advanced Visualisation and Gasification (see below) to NESO under Big Ideas.  They do indeed have a Customer Interface (TIDE) project, and the Grand Optimiser project as would be used for Walkthrough Commitment and Scheduling driving Dispatch, Instruction and finally outturn.  Replies still looking at individual projects and not the combined approach for FES modelling.  Thus I am between annoyed and rather worried about the 'Whole Orange'  As we currently have an expensive 'Squidgy Mess'.    As regards Gasification you saw my post on China using BGL for Coal Energy by pipe.  It has been used for Trash but that is more difficult to feed and needs more work.  Also if we do process  the Waste Dumps there may only be enough for Low Carbon Liquid Fuel for say Aviation.  So back to the Electrolysers.  But note that digging up the Active material from the dumps and backfilling with Inert material gives more brownfield form Housing. Which the Deputy Prime Minister is desperate for to make the 370000 Starts per year target. Just waiting for the docs for the export certification for my personal 9kW PV system, although the 20kWh battery should avoid Export as long as I can get some automated prediction for the PV. Unfortunately the latest upgrade to Weather Underground App seems to have removed  Irradiance data from the data presented from each registered Private weather station. Also Irradiance was never on the Met Office App and Web Page.