Part 2 So, assuming we need seriously Flexible combustion (Gas Turbines and Internal Combustion) Low Carbon fuelled plant and quite a lot of it.  So we end up with serious excess. Including extra extra renewables to drive Electrolysis ; i.e capacity of Renewables inc Hydro + Nuc vs capacity (as historical basis) of Combustion +Hydro + Nuc)  to meet the same demand..... And of course serious extra Demand Energy from existing Fossil provided Heat and Transport. With the major Seasonal variation of Fossil Heat now as Electricity.  Having to meet the Peak rate of Delivery, instead of having the Linepack Buffer.  Which leads to even more serious Underutilisation of the expensive Transmission and Distribution. So, to install new Flexible Combustion plant which is most efficient at various output levels and Geographically spread.    And able to provide Stability Support across all times whatever Renewables are doing..  To avoid another load of separate equipment (Instantaneous stability to short term (2 hr) Reserve, Dispatch and Volts)  plant put in for that purpose under in HellWindig conditions..... But noting that if Vanadium Redox Flow Batteries can be deployed (thanks to Eric for historic and latest info) that gets us somewhat longer. So Flexible Combustion Plant with a Clutch to an an Inertia Enhancing device then the Alternator. . Noting that Steam Turbines have an Inertia Constant of 6 seconds whereas for Internal Combustion Engines it is 1.5s. From 2004 I proposed I/C Engines (MW scale) at Distribution 11kV or 33kV levels, With Clutch and Flywheel; although I was worried about effect of the Flywheel weight when starting with all components at rest.  Engine efficiency 40% to Electricity and another 40% to  Heat at Full and half load.       Configured for CCHP at large premises and at CHP at District level, in places where the 415V cables are Underground. With Colocated big Heat Pump and of course serious Thermal storage.  .  .   Plus MAN Electrothermal Energy Storage (C02 Working medium) which converts the Heat Energy sources to different temperatures.  Thus can raise Heat Pump output temperatures   Gets round the problem with rad sizing. For premises in Dense Urban to Suburban areas with Underground 415V (1 or 3 phase) supplies. New Heating Pipes under the streets. But not bigger cables and bigger 11kV/415V Transformers.   Thus avoiding reinforcement of the major part of the Distribution 80000km of circuits and over 58500 substations. And avoiding the increased Distribution losses. And colocated EV charging points, although time managed charging at smaller Premised moved to Off Peak alleviates that strain on the 415.  But remember that Transformers need Daily Demand cycling from High to Low and Back to maintain rating.  .And at some premises (with no Drive) it has been difficult to connect the vehicle to the Charger without crossing pavements and other walkways. But, for premises with overhead 415V supplies (3 phase or 1 phase 240V to premises), especially where off the Gas Grid and especially where 'spread out' (mainly Rural)....... Reinforcement of Pole Transformers and lines to supply ASHP or GSHP (or even WSHP) plus EV loads will of course be more practical. And, certainly for Off Gas Grid Premises should be progressed fast. Admittedly finding room for DH centres in Urban and Suburban areas can be tricky.  We have 6000MW of CHP (each usually sized to minimum Thermal or Electrical Demand to justify..  So, as we did with London's transport from 1863 (and now the Supergrid and the new monster Sewer) 'Go Downwards' ,   Citigen in the giant underground cavern under Smithfield supply Heat to Buildings in the City via big pipes through the Underground Car Parks.  Nat Hist Museum Heat themselves and the V&A; old local District System.  Big Plant Room in the Basement with the Engine in a large Soundproof box!!. Only justified when the Absorption Chiller went in.  And there is Vertical GSHP (VGSHP?) with multlple 100ft pipes going down. Not as efficient as subsurface GSHP due to the Pumping load.