Part 1 my ideas look at the combined issues of domestic HP and EV impact on the underground (esp lower level) wiring reinforcement and losses, starting with the need for combustion fuelled (and Hydro) machines to cover Dunkelflaute. And the overall need to cover Security and Stability under HellWindig. The main fact being that Electricity Delivery is highly inefficient in use of infrastructure and excess plant causes serious high prices. Thus CfD payments have been transferred to central taxation. Gas delivery is more inefficient in Energy terms over the year but has simpler infrastructure and does not have to match rate of Suppy to rate of demand (esp at Peak and nearby) which us the case with electricity delivery. Fragmentation lead to serious excess plant and crippled the Industry for the first 50 years of Public supply (1882 to 1933). See ESI history at www.eleceffic.com With renewables we are of course going to have excess capacity of both plant and wires. With Nuclear plant fixed adding to the need for flexible capacity. Thus we need to make sure those combustion based machines run seriously efficiently (overall Energy Provision) and also provide stability services. Current running of CCGTs at low load (Super MSG for Stability under HellWindig conditions) are not efficient and goodness knows what low throughput is doing to the Heat recovery steam generators. It may be that the CT is running at the level for minimum throughput of the HRSG. If this is above the Steam flow to keep the ST at its low output, then they may be using the ST bypass (used during ST roll up to speed) to dump the excess steam to the condensor. And short duration battery storage for stability just adds more excess capacity. It is distributed round the system as required for phase jump and Inertial correction then reserve after an electrical and/or plant loss or demand throwoff. Hell = Bright, Dunkel = Dark Windig = Breezy, Flaute = Calm